Westin Hotel
Our primary scope of works was to take possession of the Mezzanine floor area which was fully stripped back to its original features and convert this floor into 19 Luxury ensuite Bedrooms, a new lounge area and all ancillary facilities required to service the new bedrooms
- Client: MHL Group
- Location: Dublin 2
- Role: Main Contractor & PSCS
All Project

Osprey Hotel Spa
Construction of new Alterations & Upgrade Construction and Fit-Out Works at the Internal Ground, First, Second & Third Floor levels along with works to the Ground Floor External Entrance area....

Morgan Hotel
The project was located in a very busy area of Dublin City Centre. Azure completed all refurbishment works within an extremely tight time frame while at the same time facilitating the Hotel's continuous operation....

Intercom
Azure Contracting were approached by Intercom at the design stage of the project to work in collaboration with the design team to create an open plan, spacious, and “studio like” space (15,000 sq. ft.) with no visible spatial hierarchy....

Fineos
This building comprises of 3065 sq.m in area and the scope of the project included: Accommodation for 290 staff, a variety of meeting spaces to service their company’s work patterns, staff canteen, staff exercise room, new showers/changing facilities for cyclists, and private offices reprographic areas....

CurrencyFair
CurrencyFair needed a new space to house over 125 employees and chose the team of Azure to fit-out their new office home. Construction was performed on the 1st and 2nd floors of this building....

Broadstone Hall
Complete Refurbishment of 4 Storey Student Accommodation Building, located in Phibsborough, Dublin 7....

Wexford County Council
The layout for these new offices features a single facility with six buildings around a public internal street, creating a townscape which is both open and easy for visitors to navigate. ...

Westin Hotel
Our primary scope of works was to take possession of the Mezzanine floor area which was fully stripped back to its original features and convert this floor into 19 Luxury ensuite Bedrooms, a new lounge area and all ancillary facilities required to service the new bedrooms...

REHAB Group Ltd
The fit out involved the refurbishment of the existing ground, 1st & 2nd floor plates. The existing interiors was stripped out to grey box leaving only the raised access floor....